____
Yanbu processed water station provides wastewater
management solutions for sanitary and industrial effluent to
the residential and industrial areas in Yanbu 1 and Yanbu 2.
Yanbu’s processed water facility is one of the most equipped in the Kingdom, with two wastewater treatment plants and 89 lift stations, 61 of which are designed to collect sanitary wastewater and the other 28 to collect Industrial wastewater from the Yanbu Industrial City.
We have an extensive sewage collection network for sanitary and industrial sewage stretching to about 680 km and 65 km, respectively.
Marafiq has installed two capable and dedicated plants to treat industrial and sanitary effluent in a wastewater treatment complex in the heavy industrial zone.
Commissioned in 2014, the Industrial Wastewater Treatment Plant (IWTP) can process 48,000 m3/day, using the Fenton treatment and Granulated Activated Carbon (GAC) to ensure compliance with the regulation from the Royal Commission. The plant is designed to filter out contaminants from the sewage and make it re-usable for industrial purposes or discharged into the Red Sea without causing a significant environmental impact.
The Sanitary Wastewater Treatment Plant (SWTP) treats raw sanitary sewage coming from the community and industrial areas and has four main treatment processes, including primary, secondary, tertiary, and sludge removal. With a capacity of 47,000 m3/day, the plant provides safe irrigation water for landscape development purposes in nearby areas.
The processed water from the sanitary wastewater treatment plant is mainly used as safe irrigation water for landscape development, meeting the Royal Commission Environmental Regulation (RCER). Similarly, the industrial wastewater treatment plant treats water for firefighting and non-potable utility water for industrial use.
2022 Marafiq. All rights reserved.